Construction Schedule
The project includes the reconstruction and widening of US1 from North of the PA Turnpike to North of the CSX/SEPTA RR. The project incorporates the construction of three (3) US1 Mainline bridges over SR204 (Rock Hill Dr), Neshaminy Creek and over the CSX/SEPTA RR. The project involves the installation of a sound barrier wall, ten (10) sign structures, three (3) retaining walls and placement of stormwater system and environment control measures project wide. The US1 Section RC2 will be completed in nine (9) stages.