Stage 3

  • Full depth reconstruction of U.S. 1 median and inside lanes to be performed.
  • Construction of U.S. 1 SB on-ramp from Street Road to be performed.
  • PA Turnpike Slip Ramp from Horizon Blvd. to be realigned and reconstructed.